Category Archives: 2016

MISG 2016

MISG 2016 ran from 1-5 February 2016. The problems included:

  • Inference in a knowledgebase (DST Group)
  • Sequencing ore extraction to control blend quality (Schneider Electric)
  • Modelling water pollutant density associated with surface water runoff (SA Water)
  • Optimisation of household PV and storage (Ergon Energy).

Thanks to everyone who contributed to a successful MISG.

Useful links: